Camp Work Thursday 16 October

  • geezer
  • geezer's Avatar
  • Platinum Member
  • Platinum Member
  • Posts: 4349
  • Thank Yous: 448
14 Oct 2014 10:45 #1 by geezer (geezer)
Camp Work Thursday 16 October was created by geezer (geezer)
Mark Bradford and I will be working at Sac 10-16
Projects are:
Some work on winterizing the Londwyn tent
Some work on the second floor of the IHOP (Lord's Manor)
Storage chest/bed for the wigwam
Finishing the bed in the Bishop's room
Steps for the two beds in the other small room in the monastery
Enclosed, lockable storage area in both rooms.

The two of us cannot finish it all by ourselves. Any who can join us, please post below. We usually arrive between 11 and noon and work until 5 or 6

Edwin Haroldson
Loremaster
Master of the Mages' Guild

An ethical person does the right thing when no one is watching.

OOG - Charlie Spiegel - Kitchen Marshal

"War is a matter of vital importance to the State..."
The following user(s) said Thank You: Sister Danae (Danae)
Moderators: Lois Heimdell (LoisMaxwell)
Time to create page: 0.452 seconds